Galicien 7

Galicien 7 - Ferrari Architectes
Lieu
Prilly
Dates
2011-2012
Programme
Logement
Maitre de l'ouvrage
Caisse de pension Schindler – Ebikon représenté par HIG Asset Management AG
Procédure
Mandat direct
Coût
4.1 Mio
Surface SPB
840 m2
Volume Sia
4’330 m3
Resp. au sein du bureau
Davide Cisternino

Présentation du projet

Located near the new Malley station, the building has nine apartments on three floors and a parking level that connects to the basement of the existing building on the plot. At the ground floor, the creation of a developed area allows the connection between the new and existing buildings. This new meeting place connects the entrances of the two buildings. The project required an exemption from the district plan that included a tertiary assignment for the second building allowed on the plot, which allows us to respond to the current housing shortage.

The project wants to highlight the horizontality expressed, seeking contrasts with the verticality of the existing building, it takes form with a superposition of horizontal stripes. The light colored minerals bands take the height of the windowsill and form a continuous belt across the building perimeter. While openings are included in a dark stripe in a slight retreat, it is punctuated by alternating modules of glace and metal panels. In addition, the facade is characterized by its corner balconies corresponding to the outer extensions of the major living spaces.

Galicien 7 - Ferrari Architectes
Galicien 7 - Ferrari Architectes
Galicien 7 - Ferrari Architectes
Galicien 7 - Ferrari Architectes
Galicien 7 - Ferrari Architectes
Galicien 7 - Ferrari Architectes
Galicien 7 - Ferrari Architectes
Galicien 7 - Ferrari Architectes