Location
Prilly
Program
Administration
Years
2008-2011
Client
Commune de Prilly
Type
Concours SIA
Award
1er prix
Cost
15 mio
Volume SIA
9'400 m3
Size
2'761 m2
Sustainable development
Minergie
The concept reflects the desire to reinforce the relationship between the existing and future administrative buildings: Le Château, the castle building, the new Office wing and the existing bake-house. The resulting urban constellation generates a central outdoor space that serves as a public reference point. The urban concept is to create a “village square” that orients the visitor and provides an interaction point. The contemporary architecture of the new building uses its geometry and materiality to create a contrasting dialogue with the existing historical buildings. By detaching itself, the new construction does not compromise the historical qualities of the “Château”. This autonomy offers total freedom in the planning of the internal spaces more suited to modern office layouts.